Complete Design Layouts, Documentation and RAMS for Retail Store Fit-Out and Construction. At Innovative iTech we provide a single, coordinated package that takes your retail project from the first sketch right through to site hand-over, covering concept design, technical drawings, landlord approvals, and full RAMS (Risk Assessment and Method Statement).
Define the vision & customer journey
- Vision & Experience Narrative: Interactive zones, learning spaces, sustainability features
- High-Level Floorplan: Entrances, adjacencies, traffic flow, core fixtures
- Material & Ambience Concepts: Mood-boards, finishes, lighting tone
- Area Take-Offs: Sales, storage, back-of-house, staff areas
Landlord concept approval
- Basic floorplan + shopfront elevations
- Opening treatments, glazing ratios, signage zones
- Concept finishes & branding cues
- Landlord focus: Compliance, proportions, service layout, architectural intent
Construction-ready shell & core
- GA plans, shopfront sections/elevations
- Bulkhead, wall-build, structural junction details
- Partition types with fire/acoustic ratings
- Review covers: Structural tie-in, fire strategy, storefront ratios, corner resolution
Full integration of building systems
- Complete MEP drawings: Lighting, small-power, HVAC, sprinklers, drainage
- Connection to landlord risers & BMS
- Sustainability targets: ISO 14001, waste control, smart energy
Fabrication & specification pack
- Shopfront fabrication drawings, custom joinery, fixture details
- Finish schedules and product datasheets
- Load calculations and installation strategies
Everything signed, sealed & site-ready
- Site access & delivery logistics
- Hoarding plans, phasing & sequencing
- Fire strategy sign-off, vertical transport, HSE compliance
- Final landlord & statutory approvals
Key Design & Compliance Criteria
| Item | Requirement |
|---|---|
| Shopfront Ratios | ≥ 50% open, ≤ 20% solid, ≥ 30% glazed |
| Clear Opening | ≥ 8 ft 6 in (2.6 m) high × 6 ft (1.8 m) wide |
| Structural Independence | No load on mall bulkheads |
| Fire Compliance | Rated partitions, smoke-zone integration |
| Sustainability | Waste management, energy-efficient lighting & water systems |
Phase-at-a-Glance
| Phase | Core Focus |
|---|---|
| Concept Design | Vision, layout, materials, flow |
| RD1 – Schematic | Shopfront massing, brand positioning |
| RD2 – Detailed | Construction drawings, partitions, finishes |
| RD3 – Services | MEP, sustainability, integration |
| RD4 – Technical | Specs, fabrication, custom detailing |
| RD5 – Pre-Build | HSE plans, logistics, final approvals |
RAMS: New Retail Store Project
(Risk Assessment & Method Statement)
1. Project Details
| Project Title | New Retail Store Fit-Out / Construction |
| Location | TBC |
| Principal Contractor | TBC |
| Start Date | TBC |
| Duration | TBC |
| Site Contact | TBC |
2. Scope of Works
- Internal fit-out: partitions, flooring, MEP, ceilings, signage, finishes
- External signage & minor façade works (if required)
- FF&E procurement and installation
3. Method Statement
Site Setup
Deliver plant/materials, erect signage/hoarding, establish welfare
Strip-Out / Demolition
Remove existing finishes under H&S & environmental regs
MEP Install
Cable containment, wiring, HVAC ducting, plumbing; testing & commissioning
Partitions & Ceilings
Metal/timber framing, plasterboard, suspended ceilings
Flooring
Sub-floor prep, tile/carpet/vinyl install
Decoration
Painting, brand feature application
Signage & External
Fit internal/external signs, make-good entry points
FF&E
Assemble shelving, counters, POS
Final Clean & Commission
Builders' clean, snag list, fire alarm & HVAC balancing
4. Risk Assessment Summary
| Hazard | Risk | Controls |
|---|---|---|
| Working at height | Falls | Towers, harnesses, edge protection |
| Manual handling | Back/hand injury | Training, trollies, lifters |
| Electrical work | Shock/fire | Certified electricians, LOTO |
| Dust & noise | Respiratory/hearing | Masks, ear defenders, extraction |
| Power tools | Cuts/eye injury | PPE, pre-use checks |
| Slips/trips | Sprains | Housekeeping, cable mats, signage |
| Fire | Burns/smoke | Extinguishers, evac routes |
| Public interface | Third-party injury | Hoarding, access control |
| Lifting ops | Crush injury | Lift plan, banksman, certified crane crew |
5. PPE Requirements
Hard hats · Hi-vis · Steel-toe boots · Gloves · Eye protection · Hearing protection* · Dust masks*
*As task requires
6. Emergency Procedures
| First Aid Point | [location] |
| Nearest Hospital | [details] |
| Fire Assembly Point | [location] |
| Site Emergency Lead | [name / contact] |
7. Training & Competency
All site personnel must hold:
- Valid CSCS (or equivalent) card
- Site induction attendance certificate
- Task-specific tickets (e.g. PASMA, IPAF, Manual Handling, Asbestos Awareness)
8. Environmental Measures
- Segregated waste via licensed carriers
- Noise restricted to agreed hours
- Dust suppression in sensitive areas
- No unnecessary idling of plant/equipment